Skip to main content
← Back to all posts

Aug 16, 2026 · 1 min read

1996 Solway Meeting Rd

Photos 1-3, 7 and 8 are artist’s renderings of the finished home. Photos 4-6 show the home under construction on September 29, 2026. Estimated completion is January 2027.

New construction in Big Clifty with estimated completion in January 2027. This 3-bedroom, 2-bath home offers 1,672 sq. ft. of finished living space, a 582 sq. ft. attached 2-car garage, a 128 sq. ft. covered front porch, and a 192 sq. ft. rear concrete patio. The open floor plan features a vaulted living room, split-bedroom design, spacious primary suite with walk-in closet and private bath, and a kitchen with island open to the dining area.

Constructed on a 4-inch concrete slab with a 6-mil vapor barrier over a minimum 4-inch gravel fill. Exterior features include vinyl siding with board-and-batten accents, masonry block wainscoting, dimensional shingles, aluminum gutters, and vented vinyl soffits. Built by Helm Construction LLC — buyers still have time to select finishes at this stage of construction.

Offered at $315,000. MLS# HK2603236. Contact Rebecca Carter, eXp Realty, at 270-765-8125.

Working on something in Central Kentucky?

The research is free. So is the first call.

We broker commercial property along the I-65 corridor in Central Kentucky, and we publish what we learn along the way.